Skip to content

Index / HSR Layout / 025

025 Concrete slabs delivered to the tree

Unfixed for
5 days
Concrete slabs delivered to the tree — construction debris at 19th Main Road, HSR Layout, Bengaluru
11 Oct 2026, 9:11 am · Four massive drain covers stacked where feet belong. They will remain here until the next geological epoch.

Within 500 metres

All footpaths